1,closed mechanical power,following the completion of the work,is no boot!!
2,substrate: substrate cleaning agent,contact the revival of small brushes - (recorded the location of contact or terminal),a serious,clean water and cleaning brush (available a small amount of neutral detergent),again with water-clean,and then immediately dry air spray gun to be sprayed dry and then dried up around 24 hours.
A use of "substrate cleaning agent" clean substrates.
B use "of the revival of contacts" to clean all joints and contacts.
3,pressure,relays,electromagnetic switch: high resistance table,tap revival of
A spray gun to clean up the air and water sludge;Fans again to be exact or hair dryer drying (60 ° C below).
B relays,electromagnetic switch tap directly be updated,if not they should buy one by one order of decomposition,cleaning,descaling,cleaning,mix,not all at once to avoid decomposition being mangled position causing greater problems;Decomposition not lost any attention at the Annex,wiring should make a record of Line code and the relative position.
C prior to the use of high resistance to the table coil impedance confirm whether there are short-circuit?(100 megohms above).
Boot test whether more attention should be paid to smoke or odor.
4,motor or hydraulic motors: high resistance table,and "pressed monkey" (Bearing out of )---- (recorded the location of contact or terminal)
A motor repair to the customers sent from the best motor repair shops,and the effects of human use will be better.
B air spray gun to clean up sludge and water.On both sides of the replacement motor bearings.
C fans or hair dryer to be exact drying.(60 ° C below) prior to the use of high resistance to the table coil impedance confirmed confirm whether there are short-circuit?
D boot test whether more attention should be paid to smoke or odor?
5,DC motors:
A Decomposition of Carbon Brush removed or covered,and behind ENCODER Carbon Brush,covered.Another air spray gun to clean up sludge and water.
B.ENCODER part of the same substrate cleaning.
C fans or hair dryer to be exact drying (60 ° C below).
D bending machine screw and guide: Other aircraft types and guide screw with this method.
6,regulation,D axis screw and guide: At the moment of their hands before and after moving to be exact cleaning,lubricating,so as not to 2,3 days rusty jam caused greater losses.
7,Bending Machine (M S / M) electromagnetic clutch and brake: heavy,clean water and cleaning brush (available a small amount of neutral detergent),again with water-clean,and then immediately dry air spray gun to be sprayed dry.
A to antirust oil (such as WD-40) its internal spraying to prevent rust bite.
B dried up again about 24 hours.
8,and even switch and the solenoid valve:
A away hoods,let drips and breathable,air spray gun to clean up mud and water.
B-linked part of moves to switch lubricants lubrication.
C 24 hours of their natural drying according to the original location to be loaded.
9,FANUC AC servo motors: Maintenance will be sent dismantled.
10,FANUC control substrate: the same substrate cleaning,attention to the machine itself "DATA SHEET" access and copying.
11,the substrate connector: air spray gun to clean up sludge and water,some of the joints should decomposition,dryer combinations later,after cleaning should be allowed under the joint vertical lines in order to facilitate a water droplet (especially the joints FAUNC controller).
12,the oil pressure: new oil filter and air bucket,PUMP,funnel
A quality check whether oil has been up muddy water or sludge?If should be replaced with new oil and filter.
B has no oil change more than a year are proposed to be replaced with new oil and filter.
13,mold and other transmission,such as iron I.moving part:
A sludge and air spray gun cleaning up water,then according to the provisions of lubricating oil or butter.
B lubrication and maintenance position should once again according to the manual maintenance.
14,San-lien Air Compressor Group (including Die automatic lubrication system): good clean-up after adding a new AT-32,in addition to water filters,cleaning,adjusting drip rate.
15,AT-32 recovery: When we complete these matters,then indeed be itemized recovery,before turning on and testing.
|